REPORTS OF EXECUTED WORK:
|
JSC "MU-3", Affiliated Company of Public Corporation "Elektrouralmontazh" December 2006 through January 2007 performed the following series of work: offloading, installation and testing of power autotransformer ANER-3E (АТDTsTN/250000/500/110 PN, МEK-60076 standard, and serial number 1133686) that was mounted on the 500 kV substation "Zlatoust". The Customer is Public Corporation "FSK EES" (Federal Net Company of the Unified Electric Power Systems, a branch of the Main Electrical Network System of Ural. The transformer manufacturer is ABB SP z.o.o. Poland.
The autotransformer was installed in accordance with the requirements of the technical documentations of ABBSP company and also the work documentation 34.45-51.300-97 "Capacity and regulations of electrical equipment testing" and work documentation 16.363.-87 "Power transformers".
The technological equipment for processing of the 500 kV insulation used by JSC "MU-3" was adapted to the requirements of ABB Company.
|
|
|
|
JSC "MU-3", Affiliated Company of Public Corporation "Elektrouralmontazh" August through December 2006 implemented commissioning of power unit 2 of Chelyabinsk Cogeneration Plant 3 including the steam generation unit with an output of 640 tons of steam per hour, the turbo-generator T-180/210-130 with the transformers TDTs-250000/220, TRDNS - 32000/35 and the 220 kV outdoor switchgear and also:
-
Electric installation work within the scope of the whole starting complex of power unit 2;
-
Installation of the CAPP system of power unit 2 in accordance with the project elaborated by "Emerson" company (Moscow) and Public Corporation "Energosoyuz" (Saint-Petersburg);
-
Installation of the instrumentation of power unit 2;
-
The construction part of the 220 kV outdoor switchgear;
-
Bundling of the cable lines, wiring accessories, light fitting, turned manufacture and stop valves of the instrumentation;
-
Installation of the fire alarm and automatic extinguishing.
|
|
JSC "MU-3" at the construction project of power unit 2 of Chelyabinsk Cogeneration Plant 3 fulfilled the complex installation of the equipment for the Computer-Aided Technological Calculation of Electric Power System (CATCEPS).
The project was carried out with high quality.
|
|
|
|
JSC "MU-3", Affiliated Company of Public Corporation "Elektrouralmontazh" according to the contractor's agreement 20.09 - KS with Public Corporation "Federalnaya kompaniya Edinoy Energeticheskoy Sistemy" (Federal Net Company of the Unified Electric Power Systems - a branch of the Main Electrical Network System of Ural) of September 20, 2006, fulfilled the project by the title "Entries for the 220kV overhead transmission line of Chelyabinsk Cogeneration Plant 3" October 2 through December 15, 2006, including:
-
Reconstruction of the 220 kV cell at "Novometallurgicheskaya 220/110 kV" substation, including the dismantling of the old equipment and construction part, developed construction work, installation of the new equipment with the sulfur hexafluoride circuit-breaker made by "Siemens", wiring and secondary commutation assembly, commissioning and adjustment work;
-
Reconstruction of the 220 kV cell at "Kozirevo 500/220/110 kV" substation, including construction, installation, commissioning and adjustment work;
-
Bundling of the basic equipment, relay protection facilities, emergency automation and HF-communication of the whole project;
-
Construction of the entries for the 220 kV overhead transmission line of the 220 kV outdoor switchgear of Chelyabinsk Cogeneration Plant 3.
High quality of building, installation, commissioning and adjustment work was kept.
|
|
Term
|
Customer
|
Description
|
August 2006 -
December 2006
|
Customer:
Territorial Engineering Company-10
RIC "EES Rossii"
(the Unified Electric Power Systems of Russia)
Contractor:
Public Corporation "EMK-Engineering Company"
Lenin av.,19, Moscow,117927
tel. (095) 7974359, 7972894.
|
Chelyabinsk Cogeneration Plant 3.
The construction of power unit 2
Installation of the electrical equipment of power unit 2, cable lines, electrical equipment of the 220kV outdoor switchgear, light fitting,
CAPP system, instrumentation,
commissioning and adjustment work.
|
September 2006 -
March 2007
|
Public Corporation "Mechel"
Second Paveletskay str., 14,
Chelyabinsk, 454047
|
Public Corporation "ChMK" (Chelyabinsk Metallurgical Industrial Complex), Cogeneration Plant,
Boiler 4.Boiler type: E-220-3,2-425 GD
Installation of the electrical equipment, instrumentation, cable lines, light fitting.
|
March 2004 -
December 2006
|
Municipal Office "Sluzhba zakazchika po stroitelstvu i remontu" (Building and repair service for customers) Transportnaya str., 25, Snezhinsk, the Russian Federation, 456770
tel.+7 (35146)3-29-63
|
Construction and installation of Main Reducing Substation 6 "Kurchatovskaya". All set up. Construction, wiring, installation of electrical equipment and cable lines, including adjacent substations. Delivery of equipment and materials.
|
February 2005 -
July 2006
|
Public Corporation "Federalnaya setevaya kompaniya Edinoy energeticheskoy sistemy" (Federal Net Company of the Unified Electric Power Systems)
Main Contractor:
Public Corporation "Elektrouralmontazh"
Kuznechnaya str., 92, Yekaterinburg, GSP 0190, 620219
|
Reconstruction of the 500 kV substation "Zlatoust".Construction of the 110 kV and 500 kV outdoor switchgear, installation of the electrical equipment, cable lines, communication facilities, CAPP system. Delivery of equipment and materials.
|
September 2005 -
January 2006
|
Khakas Company of the Main Electrical Network System of Siberia
Main Contractor:
Public Corporation "Uralelektrosetstroy"
Kuznechnaya str., 92, Yekaterinburg, 620219
tel. +7 (343) 350 40 09, 350 57 37
|
Reconstruction of the 500 kV substation "Abakanskaya" and 500 kV substation "Oznachennoe"
Installation of the 500 kV equipment, secondary commutation, CAPP system commissioning and adjustment work.
|
June 2006 -
December 2006
|
Public Corporation "Kostromaenergo"
Main Contractor:
Public Corporation "Uralskaya Energeticheskaya stroitelnaya kompaniya" (Ural Power Construction Company)
Kuznechnaya str., 92 - 418, Yekaterinburg, 620219
tel.8 (343) 350-57-37
|
The 110 kV outdoor switchgear, 110 kV
distribution desk "Sharya". Reconstruction of the 110 kV substation "Promuzel", substation "500/110/10 kV Zvezda".
Installation of the electrical equipment, cable lines and lighting equipment.
|
September 2006 -
December 2006
|
Public Corporation "Federalnaya setevaya kompaniya Edinoy energeticheskoy sistemy" (Federal Net Company of the Unified Electric Power Systems)
The Main Electrical Network System of Ural
Tolmacheva str., 6, GSP-909, Yekaterinburg, 620219
tel./fax. +7(343)592-259, 598-519
|
Entries for the 220kV overhead transmission line of Chelyabinsk Cogeneration Plant 3, the 220 kV cells for substation
"Novometallurgicheskaya" and substation "Kozirevo"
Construction and installation of the equipment, cable lines and secondary commutation.
Delivery of equipment, commissioning and adjustment work.
|
October 2006 -
March 2007
|
Main Contractor:
JSC "Lepspetsstroy" Construction Company
Titova str., 29, Yekaterinburg, 620058
tel./fax. (343)217-18-13
|
The 500 kV Substation "Zlatoust", autotransformer AT-3
ATDTsTN-250000/500/110
Construction and installation of the electrical equipment.
|
April 2006 -
December 2006
|
Limited Company "Proektstroyinvest"
Gagarina str., 35A, off. 18, Yekaterinburg, 620062
|
The substation of Public Corporation "FSK EES"
(Federal Net Company of the Unified Electric Power Systems), a branch of the Main Electrical Network System of Ural.
Replacement of the 500 kV entries at the 500 kV substation "Tagil",
replacement of the 500 kV entry at the 500 kV substation "Yuzhnaya",
replacement of the 220 kV entries at the 500 kV substation "Yuzhnaya",
replacement of the 500 kV entry at the 500 kV substation "Udmurtskaya",
replacement of the 500 kV entries at the 500 kV substation "Magnitogorskaya".
|
|
|
|
|
|
 |
|
|
 |
| | |
Available technologies:
- Installation of electrical equipment of any class from 200 to 1150000 volts high;
- Installation of instrumentations and automatic control systems;
- Installation and repair of heavy-duty power transformers;
- Installation and repair of stationary storage batteries;
- Installation of cable lines up to 110000 volts high;
- Supply of electrical equipment, cables and conducting materials, panel instruments and lamps;
- Wiring of housing and social sphere projects;
- Installation of CAPP systems, including FOCL;
- Trial, special metering and electrical-equipment check-out of electric power industry and housing projects.
|
|
|
|
|